The pass-through spars and the pressure bulkhead beneath the spar have been mounted in place. Next, the landing gear will be installed on the backside of the pressure bulkhead.
The pass-through spars and the pressure bulkhead beneath the spar have been mounted in place. Next, the landing gear will be installed on the backside of the pressure bulkhead.