Veloce 600 Update – 11/13/2024
We are very close to completing the bench testing for the Garmin avionics that will be installed in the 600 panel, along with all the wiring.
We are very close to completing the bench testing for the Garmin avionics that will be installed in the 600 panel, along with all the wiring.
Landing Gear Legs Completed.
We’re almost finished with the tail, with just one last repair needed on this rib. We’ve completed all the nut plates, backing plates, and drilled the necessary holes. Once this rib is installed, we’ll be able to proceed with the rudder cables. By next week,
The window piece didn’t turn out well – it was warped and bent. It wasn’t heated enough, and by the time we placed it over the mold, it didn’t hold or take shape properly. We’ll have to try again at a higher temp.