Recent Posts

Veloce 600 – 03/11/2025

Progress continues on the Veloce 600. The control systems are being installed, with aileron push rods and connectors in place. The firewalls are set, fuel tubing is positioned, and the torque tube for flap control is installed. One wing is drilled and prepped, with work Read More …

ANG Kit 10 – 03/10/2025

Most of the engine has been mounted, and nearly all the controls inside the plane are assembled. The autopilot servos have been installed, and work is underway to finalize the control systems. The steps are in place, the AC system is being installed, and bodywork Read More …