Veloce Update – 10/28/2024
I have two printers running, one mill operating, and I’m working on getting the second mill started.
I have two printers running, one mill operating, and I’m working on getting the second mill started.
We installed the 4-inch linear actuator support for precise flap deployment at 0°, 15°, and 30° positions. The bracket is welded securely, and you can see the smooth movement from both inside and outside the plane.
We are infusing the elevator front skin so that we can lay up everything in the tail controls next week. We had a mess-up with the horizontal stabilizer – the foam cutouts weren’t placed correctly. We’re fixing it now so we can close up the
We already have the molds ready for the 600’s back windows and are building a small oven to produce the glass pieces and windscreen for them in-house.