600 Kit №2 – 02/17/2025
We’ve milled the rudder and elevator hinges for the second Veloce 600 kit, as we had already made them for the prototype.
We’ve milled the rudder and elevator hinges for the second Veloce 600 kit, as we had already made them for the prototype.
The pass-through spars and the pressure bulkhead beneath the spar have been mounted in place. Next, the landing gear will be installed on the backside of the pressure bulkhead.
We’ve installed a retractable, electrically motorized footstep that extends and retracts at the push of a button.
The trim tab flap control system has been successfully actuating the trim tab. The trim tabs were designed with a mechanism that extends to the actual trim tab. Since most of the weight is now in front of the elevator hinge line, less weight will