Veloce 600 – 03/11/2025

Progress continues on the Veloce 600. The control systems are being installed, with aileron push rods and connectors in place. The firewalls are set, fuel tubing is positioned, and the torque tube for flap control is installed. One wing is drilled and prepped, with work shifting to the other side. The rudder is complete except for final closure, and the trim tab controls and access panels are finished. Hardware is aligned and ready for mounting. The front landing gear is scheduled for installation this week. Internal systems, including pass-through controls, keels, fuel header, bulkheads, and spars, are in place. The tail section is done, with only final closures remaining. Final work on the elevator, armrest materials, and instrument panel is in progress as assembly nears completion.