We’re finally laying up the rib flanges to ensure all the ribs have a 2-inch flange instead of the smaller one, meeting FEA requirements. Once that’s done and the controls are installed, we’ll be ready to close up the wing.
We’re finally laying up the rib flanges to ensure all the ribs have a 2-inch flange instead of the smaller one, meeting FEA requirements. Once that’s done and the controls are installed, we’ll be ready to close up the wing.